Our design team discussed the aims of the project with Mr and Mrs Hawkes and they decided they wanted to have a conservatory, rather than an orangery, as they wanted more glass to enable as much light as possible to enter their home.
This saw our teams design a conservatory 5m x 2m in size, with floor to ceiling glass panels around all three sides of the conservatory. Tinted energy efficient glass roof panels were also added to help reduce the impact of sunlight on the brightest, summer days, and ensure a comfortable feel at all times. Double patio doors ensure easy access to and from the garden.
Installation was completed in two stages. Firstly, foundations were completed in three days and left to settle for a week, before the conservatory was built over a three day period. In total, our team were on site for less than a week to complete the installation.