What did we do?
Having outlined the build process during the initial design consultation, the first task was to prepare the groundworks and lay the concrete base on which to erect the new conservatory.
After leaving the foundations to settle sufficiently for a few days, a dwarf wall was constructed, quickly followed by the glazed wall panels.
Attention then turned to installing the roof and getting the structure water tight.
The installation of all the electrics and sockets paved the way for the interior to be plastered, completing the stylish and contemporary finish.